C40 Concrete Pour Tunstall Stoke

About the Project

We recently were chosen by Cheltenham Green Property Ltd as the concrete supplier for the new industrial units in Stoke on James Brindley Way in Tunstall.

This site itself is roughly 29 acres approximately housing 5 units onsite raging between 13,000 sq ft to 30,000 sq ft, which will be ready for occupation in autumn this year. For this pour the site needed 4 cubic meters of concrete to finish off some paving, however our truck can pour upto 9 cubic meters if required.

Due to the nature of the site – where heavy loads may be loaded and unloaded everyday and large lorries/heavy machinery passing over, it meant that C40 concrete was needed for this particular job. 

This job was a straight tip on the floor so only required a 15-minute wait time, with a setting time of 24- 48 hours.

This is just one of many industry estates that we have poured ready mix concrete in Stoke for and we look forward to seeing the new estate thriving with businesses.